CHAPTER 6
Installing the SRX5600 Services Gateway
Mounting Hardware
Installing the SRX5600 Services Gateway Mounting Hardware for a Rack or Cabinet
Copyright © 2010, Juniper Networks, Inc.
This section includes the following topics:
Installing the SRX5600 Services Gateway Mounting Hardware for a Rack or
Cabinet on page 57
Moving the Mounting Brackets for Center-Mounting the SRX5600 Services
Gateway on page 59
The services gateway can be installed in a four-post rack or cabinet or an open-frame
rack. Install the mounting hardware on the rack before installing the services gateway.
Install the mounting shelf, which is included in the shipping container, before installing
the services gateway. We recommend that you install the mounting shelf because the
weight of a fully loaded chassis can be up to 163.5 lb (74.2 kg).
Table 25 on page 57 specifies the holes in which you insert cage nuts and screws to install
the mounting hardware required. The hole distances are relative to one of the standard
U divisions on the rack. The bottom of all mounting shelves is at 0.02 in. above a U division.
Table 25: Four-Post Rack or Cabinet Mounting Hole Locations
Hole
Distance Above U Division
3
1.51 in. (3.8 cm)
2
0.88 in. (2.2 cm)
1
0.25 in. (0.6 cm)
To install the mounting shelf on the front rails of a four-post rack or cabinet, or the rails
of an open-frame rack (see Figure 23 on page 58 or Figure 24 on page 59):
If needed, install cage nuts in the holes specified in Table 25 on page 57.
1.
On the back of each rack rail, partially insert a mounting screw into the lowest hole
2.
specified in Table 25 on page 57.
0.86 U
0.50 U
0.14 U
57