Installing The Srx5800 Services Gateway Mounting Hardware; Rack; Installing The Srx5800 Services Gateway - Juniper SRX5800 Hardware Manual

Hide thumbs Also See for SRX5800:
Table of Contents

Advertisement

CHAPTER 6

Installing the SRX5800 Services Gateway

Mounting Hardware
Installing the SRX5800 Services Gateway Mounting Hardware for a Four-Post Rack
or Cabinet
Copyright © 2014, Juniper Networks, Inc.
Installing the SRX5800 Services Gateway Mounting Hardware for a Four-Post Rack
or Cabinet on page 63
Installing the SRX5800 Services Gateway Mounting Hardware in an Open-Frame
Rack on page 65
If you are installing the services gateway in a front-mount four-post rack or cabinet, you
must first install the large mounting shelf, followed by the small mounting shelf.
Table 24 on page 63
specifies the holes in which you insert cage nuts and screws to install
the mounting hardware required in a four-post or cabinet rack (an X indicates a mounting
hole location). The hole distances are relative to one of the standard "U" divisions on the
rack. The bottom of all mounting shelves is at 0.04 in. (0.02 U) above a "U" division.
Table 24: Four-Post Rack or Cabinet Mounting Hole Locations
Hole
Distance Above "U" Division
3
1.51 in. (3.8 cm)
2
0.88 in. (2.2 cm)
1
0.25 in. (0.6 cm)
To install the mounting shelves (see
On the front rack rails, install cage nuts in the holes specified in
1.
for the large shelf.
On the front of each front rack rail, partially insert a mounting screw into the hole
2.
containing the lowest cage nut.
Install the large shelf on the front rack rails. Rest the bottom slot of each ear on a
3.
mounting screw.
Large Shelf
0.86 U
0.50 U
X
0.14 U
Figure 29 on page
64):
Small Shelf
X
X
X
Table 24 on page 63
63

Advertisement

Table of Contents
loading

Table of Contents