SRX5600 Services Gateway Hardware Guide
Table 22: Site Preparation Checklist (continued)
Item or Task
Locate sites for connection of system
grounding.
Measure distance between external power
sources and services gateway installation site.
Calculate the optical power budget and optical
power margin.
Related
Documentation
SRX5600 Services Gateway Rack Requirements
46
For More Information ...
"DC Power Electrical Safety
Guidelines and Warnings" on page 194
"Calculating Power Budget for
Fiber-Optic Cable for the SRX5600
Services Gateway" on
page 223,"Calculating Power Margin
for Fiber-Optic Cable for the
SRX5600 Services Gateway" on
page 223
Overview of Installing the SRX5600 Services Gateway on page 43
Unpacking the SRX5600 Services Gateway on page 53
The services gateway can be installed in a rack. Many types of racks are acceptable,
including four-post (telco) racks and open-frame racks. An example of an open-frame
rack is shown in Figure 20 on page 47.
Performed By
Date
Copyright © 2010, Juniper Networks, Inc.