1000-sheet Finisher (D588)
2.13.2 INSTALLATION PROCEDURE
Unplug the main machine power cord before starting the following procedure.
If this finisher is installed, the Bridge Unit (D634) and Paper Feed Unit (D580) or LCT (D581)
must be installed before installing this finisher.
1.
Unpack the finisher and remove the tapes.
Be sure to keep screw [A]. It will be needed to secure the grounding plate in step 3.
D129/D130
2-54
SM