Installation; Packing List; Additional Items Required; Installation Overview - Travis Industries 1080 CF Installation Manual

Hide thumbs Also See for 1080 CF:
Table of Contents

Advertisement

Packing List

Propane Conversion Kit (orifice, rate screw)
Log Set
Remote Control and Wireless Wall Switch
Reset Rod

Additional Items Required

1080/36 CF Direct Vent (available only from Travis Industries – see page 26 for part numbers)
Gas Line Equipment (shutoff valve, pipe, etc.)

Installation Overview

All requirements below must be met.
See the section
"Mantel Requirements"
See the section "Control Panel

Installation"

NOTE: Control wire is 12' long.
Drywall (or other
combustible)
Side
Wall
Non-combustible facing -
(included) see the section
"Facing Requirements"
See the section
"Hearth Requirements"
© Travis Industries
Installation
(for qualified installers only)
11"
Min.
Battery Box with 12' Wire Lead
Door Latch Tool
Andiron Brackets
4090807
See the section
"Vent Requirements"
See the section
"Minimum Framing Dimensions"
Nailing Brackets
Figure 3
100-01193_003
7

Advertisement

Table of Contents
loading

Table of Contents