Travis Industries 1080 CF Installation Manual page 55

Hide thumbs Also See for 1080 CF:
Table of Contents

Advertisement

Finalizing the Installation
8
The gas control valve has a propane conversion shaft that alters the outlet pressure. Remove
the rubber cap over the propane conversion shaft and twist the small knob so the line points to
"LP" (see Figure 36).
Inlet
Pilot Adj.
Pilot
9
Remove the NG rate screw and replace it with the LP rate screw included in the owner's pack
(see Figure 37). Take care to not damage the rubber o-ring on the rate screw when installing.
10 Replace the burner tray, burner assembly, and grate. Install the logs and embers and replace
the glass.
11 Make the gas line connection, bleed the gas line (if applicable), start the heater and thoroughly
leak-test all gas connections and the gas control valve (see Gas Line Requirements on page 16
for details). Check the pilot and adjust if necessary.
© Travis Industries
Main
NAT
Outlet
NATURAL TO PROPANE
CONVERSION SHAFT
(UNDER RUBBER CAP)
Inlet
Main
Pilot Adj.
NAT
Pilot
Outlet
RATE SCREW (BRASS)
(for qualified installers only)
Side View
NG
(Natural Gas)
Rate Screws
NG
(Natural Gas)
4090807
Conversion Shaft
(Note how it is in a lower
position when switched to LP)
LP
(Propane)
Figure 36
LP
(Propane)
Figure 37
100-01193_003
55

Advertisement

Table of Contents
loading

Table of Contents