Travis Industries 1080 CF Installation Manual page 20

Hide thumbs Also See for 1080 CF:
Table of Contents

Advertisement

20
Steps for Installing the Battery Pack and Wall Switch
1. Connect the battery pack wire harness to the receiver module where it is marked "AUX" (see
Figure 12 – item "a").
remote switch is set to "REMOTE" on the receiver module (see Figure 12 – item "b"). You may
also wish to verify the wires leading from the receiver are fully attached.
2. Connect the DCMD wires (red and red/black) to the two wires (red and black) exiting the motor
assembly on the gas control valve (see Figure 12 – item "c").
Battery Box
DCMD Wires (DC Motor Drive) - 12' Length
Red and Black/Red wires (w quick connects)
c
Pilot Flame Control Wires
© Travis Industries
Installation
At this time make sure the continuous pilot switch is set to "OFF" and the
Battery Box Wires (DC Motor Drive) - 12' Length
Black, Brown, Red, and Orange wires
AC Adapter
(wire orientation does not matter)
Gas Control Valve
Main Burner Control Wires
(for qualified installers only)
a
Receiver
Module
Not
Used
White
Green
Orange
White
4090807
Pilot Assembly
Igniter ("I") Wire
(Orange - with
fiberglass
insulation)
Sensor ("S")
Wire (White)
b
Make sure continuous pilot
is set to "OFF" and remote
is set to "REMOTE".
Figure 12
100-01193_003

Advertisement

Table of Contents
loading

Table of Contents