Vent Clearances; Vent Installation - Travis Industries 1080 CF Installation Manual

Hide thumbs Also See for 1080 CF:
Table of Contents

Advertisement

Vent Clearances

Vertical Penetrations
(through ceilings, roofs, etc.)
(firestop is required - sku 98900029)
1" Clearance To the Side
IN THE ENCLOSURE (under 82")
Vertical or Horizontal Sections:
6" Clearance Above
3-1/2" Clearance To The Side
2" Clearance Below

Vent Installation

Slide the vent sections together and turn 1/4 turn until the sections lock
in place.
Screws are not required to secure the vent. However, three screws may
be used to secure vent sections together if desired.
High temperature sealant is recommended at the appliance starter
section connection (use high-temperature silicone or Mill-Pac®).
If disassembly is required, at time of re-assembly check to see if the vent
creates a tight fit. If it does not, apply high temperature sealant to the
joints of the affected sections.
Horizontal sections require a 1/4" rise every 12" of travel
Horizontal sections require non-combustible support every three feet (e.g.: plumbing tape)
© Travis Industries
Installation
(for qualified installers only)
ABOVE THE ENCLOSURE (over 82")
Vertical Sections:
1" Clearance To the Side
Horizontal Sections:
4" Clearance Above
2" Clearance To The Side
2" Clearance Below
Horizontal Penetrations
(through walls, etc.)
(thimble is required - sku 98900030)
4" Clearance Above
2" Clearance To The Side
2" Clearance Below
4090807
27
100-01193_003

Advertisement

Table of Contents
loading

Table of Contents