PRIMARY SHEAVE AND DRIVE V-BELT
1
6
3
4
5
2
5. Install:
•
Weight
•
Nuts 1
Nut (weight):
NOTE:
To maintain the primary sheave balance, the bolts 2
SEA4200
must be installed with their threaded portions pointing
in a counterclockwise direction, as illustrated.
6. Install:
•
Primary sheave spring 1
•
Primary sheave cap 2
NOTE:
Be sure the sheave cap match mark (X) is aligned
with the spider match mark (X).
SEA4210
Bolt (primary sheave cap):
7. Tighten:
•
Bolts (VX600ER/VT600)
Tightening steps:
•
Temporarity tighten the bolts 1 ~ 6 in the order
shown.
Bolt (starter motor driven gear):
SEA4220
NOTE:
•
Clean the threads.
•
Apply LOCTITE
4-9
POWR
TR
6 Nm (0.6 m · kg, 4.3 ft · lb)
14 Nm (1.4 m · kg, 10 ft · lb)
20 Nm (2.0 m · kg, 14 ft · lb)
®
#648.