Refrigeration Piping Work; Refrigeration Piping Work Procedures And Caution In Connecting - Gree GUHD09NK3FO Service Manual

U-match iv series dc inverter air conditioners
Hide thumbs Also See for GUHD09NK3FO:
Table of Contents

Advertisement

U-Match Series DC
Inverter Service Manual
2.4 Dimension Data
Item
Model

3 REFRIGERATION PIPING WORK

3.1 Refrigeration Piping Work Procedures and Caution in Connecting

3.1.1 Flare Processing
(1). Cut the connection pipe with the pipe cutter and remove the burrs.
(2). Hold the pipe downward to prevent cuttings from entering the pipe.
(3).
(4).
D
A
A
B
848
427
412
427
B
C
D
1349
E

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents