Gree GUHD09NK3FO Service Manual page 118

U-match iv series dc inverter air conditioners
Hide thumbs Also See for GUHD09NK3FO:
Table of Contents

Advertisement

Disassembly of fan and motor
Remark: Make sure that the power supply is cut off before disassembling and protect all the parts during disassembly.
Step
Disassembly of fan motor
Disassembly of evaporator
the time for disassembly shall be long, put the copper tube under pressurized condition.
Step
screws on the side
panels of evaporator
2. Disassemble fastening
screws connecting
evaporator valve seal-
3. Removal of evaporator
Illustration
Illustration
the side panels of evaporator
Disassemble fastening screws connecting
U-Match Series DC
Inverter Service Manual
Handling Instruction
(As is shown in Graph 10, circle represents 6 screws.)
Disassemble the fastening screws on the fan
and motor. Remove the fan. (As is shown
in Graph 11, box represents screws.)
Handling Instruction
Disassemble the fastening screw connecting left and
right side panels on the evaporator and the upper cover
plate. (As is shown in the arrows direction in Graph.)
Disassemble the fastening screws on the
valve seal-plate and remove the valve seal-
plate. Disassemble the fastening screws on the
box represents fastening screws on seal-plates
Remove the evaporator. Removed
evaporator is shown in the graph.
115

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents