A/A DC INVERTER U-MATCH AIR CONDITIONERS
2.4 Dimension Data
Model
tem
A
B
C
D
E
2.5 Installation Clearance Data
3 REFRIGERATION PIPING WORK
3.1 Refrigeration Piping Work Procedures
1) Connection Pipe
The connection pipe must meet the following requirements. The three basic principles are that the pipe shall be
kept dry, clean and no leakage
Figure3-17
GUHD12NK3CO
GUHD18NK3CO
776
320
540
510
286
Figure 2-5-1
.
GUHD24NK3CO
GUHD30NK3CO
955
980
396
427
700
790
560
610
360
395
INSTALLATION
Unit:mm
GUHD36NK3CO
GUHD36NM3CO
GUHD42NK3CO
GUHD42NM3CO
1107
440
1100
631
400
86