Gree GUHD09NK3FO Service Manual page 64

U-match iv series dc inverter air conditioners
Hide thumbs Also See for GUHD09NK3FO:
Table of Contents

Advertisement

(1). nstall the hoisting stand on the hoisting screw by using nuts and gaskets at both the upper and lower
sides of the hoisting stand. To prevent the gasket from breaking off, a gasket anchor board can be helpful.
(2).
(3). Adjust the unit to the best position.
(4).
would function improperly and even lead to water leakage.
1.3.4 Installing the Suspension Bolts
(1).
(2). Install the bolts to the ceiling at a place strong enough to hang the unit. Mark the bolt positions from the
(3). Insert the anchor bolts into the drilled holes, and drive the pins completely into the anchor bolts with a
The water level test must be done after installing the indoor unit to make the unit is horizontal, as shown
below.
Horizontal tester
U-Match Series DC
Inverter Service Manual

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents