VESPA GTS 250 I.E. Workshop Manual page 203

Hide thumbs Also See for GTS 250 I.E.:
Table of Contents

Advertisement

Vespa GTS 250 I.E.
Injection
Check the resistance of the primary coil between
pin 22 of the interface wiring and the green black
cable of the injection load remote control base with
the control unit disconnected and the remote con-
trol disconnected.
Resistance of the primary = 0.5 ± 8% Ohm
Check the efficiency of the injection load remote
control: Check the resistance of the energising coil
between pins 86 and 85: 40 to 80 Ohm
Apply a voltage of 12V to pins 86 and 85; make
sure that there is continuity between pins 30 and
87 of the remote control.
Check the power supply line of the injection load
remote control energising coil: after switching to
"ON", make sure there is battery voltage, for two
seconds, between the Red-White cable and Black-
Violet cable of the remote control base. If there is
not, check the continuity of the Red-White cable
between the fuse box under the saddle hinge and
the remote control base and of the Black-Violet
cable between pin 20 of the control unit and the
remote control base.
N.B.
CONTINUITY TESTS MUST BE CARRIED OUT
WITH THE COMPONENTS DISCONNECTED.
(REMOTE CONTROLS, CONTROL UNIT,
FUSES ETC.).
INJEC - 39

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents