OmniSwitch Backup Power Shelf/System (BPS)
6
Once the holes are aligned, the second person should insert a screw through the bottom hole on each
flange. Tighten both screws until they are secure.
7
Once the flanges are aligned, install the remaining screws. Be sure that all screws are securely
tightened.
OmniSwitch 6860 Hardware Users Guide
May 2014
Rack-Mounting
page 4-13