4
Hardware installation
V
CAUTION!
Follow the safety instructions in chapter
page
19.
The server should not be exposed to extreme environmental conditions
(see section
and heat.
The server must be given time to acclimatize to its operating environment
(acclimatization time) before commencing operation.
Temperature difference (°C)
(operating environment/outside)
Table 1: Acclimatization time
4.1
Installation steps
The following installation steps are described in detail in subsequent sections of
this chapter:
Ê Unpacking the server (see section
Ê Fitting the server in the rack (see the layout diagram created usingSystem
Architect on the order lists).
Ê Wiring the server. Please refer to section
connecting/disconnecting cables" on page
Ê Connecting the server to the mains (see section
the mains" on page
RX100 S4
"Technical data" on page
5
10
15
20
25
30
46).
Operating manual
"Important information" on
15). Protect it from dust, humidity,
Minimum acclimatization time
(hours)
"Unpacking the server" on page
"Instructions for
47.
"Connecting the server to
3
5
7
8
9
10
34).
33