2 Final checks before commissioning

The first start-up is to be performed by your installation
engineer.
Make the gas line setting before commissioning.
Check the following points before starting the heater:
Hydraulic circuit:
Check that the installation and boiler are adequately filled with
water and correctly irrigated and bled.
Check that the hydraulic connections are leak tight.
Check the adjustment of the gas line:
- Connect a manometer to the pressure socket located on the
manifold.
- Check that the nozzle pressure and the start-up pressure match
the pressures given in the relevant chapter: Pressure settings and
calibrated injector markings.
If necessary, adjust the pressure as shown in the relevant
chapters: Setting the injector pressure.
18
Gas circuit:
Check that the connectors under the control panel are correctly fitted:
1
Ignition circuit
2
Gas pressostat
3
Gas valve circuit
4
Leak proofing system (Options RE 30)
Remeha Gas 460 S
Electrical connectors:
06/02/06 - 300005247-001-B