Final Checks Before Commissioning - REMEHA Gas 360 S Technical Instructions

Gas-fired boilers
Hide thumbs Also See for Gas 360 S:
Table of Contents

Advertisement

2 Final checks before commissioning

The first start-up is to be performed by your installation
engineer.
Check the following points before starting the heater:
Hydraulic circuit:
Check that the installation and boiler are adequately filled with
water and correctly irrigated and bled.
Check that the hydraulic connections are leak tight.
Check the adjustment of the gas line:
- Connect a manometer to the pressure socket located on the
manifold.
- Check that the nozzle pressure and the start-up pressure match
the pressures given in the relevant chapter: Pressure settings and
calibrated nozzle markings.
If necessary, adjust the pressure as shown in the relevant
chapters: Setting the nozzle pressure and Setting the start up
pressure.
Electrical connectors:
Check that the connectors under the control panel are correctly fitted:
1
Gas pressostat, Not used (bridge factory-fitted)
2a Gas valve 2nd stage
2b Safety box + Gas valve 1st stage
Anti-backflow thermostat Package RD19 (optional as of 10 section
3
models) (bridge factory-fitted)
4
Flue damper (
Leak proofing system, Package RD18 (bridge factory-fitted) (Not
5
used) (bridge factory-fitted)
19
Gas circuit:
Remeha Gas 360 S
20/07/05 - 300005180-001-A