2 Final checks before commissioning

The first start-up is to be performed by your installation
engineer.
Check the following points before starting the heater:
Hydraulic circuit:
Check that the installation and boiler are adequately filled with
water and correctly irrigated and bled.
Check that the hydraulic connections are leak tight.
Gas circuit:
Check the adjustment of the gas line:
- Connect a manometer to the pressure socket located on the
manifold.
- Check that the nozzle pressure and the start-up pressure match
the pressures given in the relevant chapter: Pressure settings and
calibrated nozzle markings.
If necessary, adjust the pressure as shown in the relevant
chapters: Setting the nozzle pressure and Setting the start up
pressure.
Electrical connectors:
Check that the connectors under the control panel are correctly fitted:
1
Gas pressostat, Not used (bridge factory-fitted)
2a Gas valve 2nd stage
2b Safety box + Gas valve 1st stage
Anti-backflow thermostat Package RD19 (optional as of 10 section
3
models) (bridge factory-fitted)
4
Flue damper (
Leak proofing system, Package RD18 (bridge factory-fitted) (Not
5
used) (bridge factory-fitted)