- Run the boiler at 1st stage by activating the burner on selector
switch on the boiler control panel.
- Set the flow in such a way as to obtain pressure at the injectors (0.5
x Pressure 2nd stage):
- Set the 1st stage flow with the ring E.
- By turning to the right, you increase and, by turning to the left, you
decrease the principal flow.
- Tighten the inhibitor screw C.
14
Setting the pressure 1st stage
Remeha Gas 460 S
06/02/06 - 300005247-001-B