Running Pdm; Viewing Scheduled Activities; Scheduling An Activity - Promise Technology VessRAID 1740s Product Manual

Table of Contents

Advertisement

VessRAID 1740s, 1840s Product Manual

Running PDM

Predictive Data Migration (PDM) migrates data from the suspect physical drive to
a spare disk drive, similar to Rebuilding. But unlike Rebuilding, PDM acts before
the disk drive fails and your Logical Drive goes Critical.
You an also run PDM on a specific disk array, see "Running PDM on a Disk
Array" on page 109.
Also see "Predictive Data Migration (PDM)" on page 246.
To run PDM:
1.
In Tree View, click the Subsystem
2.
In Management View, click the Background Activities tab and choose Start
Media Patrol from the dropdown menu.
3.
In the next screen, choose the Source and Target physical drives.
The suspect physical drive is the source. The replacement physical drive is
the target.
4.
Click the Start button.

Viewing Scheduled Activities

To view scheduled activities for this subsystem:
1.
Click the Subsystem
2.
Click the Scheduler tab in Management View.

Scheduling an Activity

To set a scheduled activity for this subsystem:
1.
Click the Subsystem
2.
From the dropdown menu on the Scheduler tab, choose an item:
Media Patrol. See "Running Media Patrol" on page 53
Redundancy Check. See "Running Redundancy Check" on page 114
Battery Reconditioning. See "Reconditioning a Battery" on page 90
Spare Drive Check. See "Running Spare Check" on page 120
3.
In the Scheduler dialog box, check the Enable This Schedule box.
4.
Select a start time (24-hour clock).
icon.
icon Tree View.
icon Tree View.
54

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vessraid 1840s

Table of Contents