Full Screen Arch Door And Frame Installation - Regency B36XT Bellavista Owners & Installation Manual

Medium dv gas fireplace
Table of Contents

Advertisement

INSTALLATION

FULL SCREEN ARCH DOOR AND FRAME INSTALLATION

1) Remove glass door (refer to glass door
removal in the manual).
2) Install 4 Phillips screws (supplied with
packaging) to the inside walls of the unit
(see Diagram 1 for locations).
Do not tighten the screws - leave them loose
for the next step.
Diagram 1
3) Lift screen doors off of door frame to reduce
the weight during installation.
4) Mount the door frame onto 4 loosened screws
and retighten.
Note: The door frame is adjustable up by 3/4"
to accommodate for fi nished fl ooring.
The door frame can also be adjusted out
3/4" from the unit to accommodate fi nishing
materials.
See Diagram 2
Diagram 2
58
5) Reinstall glass door.
6) Install bottom mesh door .
a) Locate tabs on bottom mesh door.
b) Locate bracket on lower fl oor of unit.
c) Hook the tab on the bottom mesh door
over the bracket to install
Diagram 3a
Tabs on bottom mesh door.
Diagram 3b
Bracket on unit for bottom mesh
door.
Diagram 4
7) Install top louver.
a) Locate tabs on top louver
Tab on top louver.
Diagram 5a
b) Line up the tabs on top louver
with the brackets on the unit.
c) Hook the tab on the top louver
over the bracket to install.
Diagram 5b
Bracket on unit for top louver
Diagram 5c
Diagram 6
8) Rehang screen doors on frame -
See Diagram 7.
Diagram 7
Final Screen Install
Regency Bellavista™ B36XT Gas Fireplace

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents