Setting Up And Connection - Roland CammJet CJ-500 User Manual

Hide thumbs Also See for CammJet CJ-500:
Table of Contents

Advertisement

What to Do upon Opening the Carton

2 Setting Up and Connection

Setting Up
Unpacking, installation, and moving
must be carried out by two or more
persons.
Failure to do so
may result in
falling of the
unit, leading to
injury.
Be sure to install the drain bottle before switching on the power.
NOTICE
Never install the unit in any of the following situations, as it could result in breakdown or faulty operation:
Places where the installation surface is unstable or not level.
Places with excessive electrical noise.
Places with excessive humidity or dust.
Places with poor ventilation, because the CJ-500/400 generates considerable heat during operation.
Places with excessive vibration.
Places exposed to strong illumination or direct sunlight.
Never step or stand on the stand legs, as doing so may damage them.
Do not place objects on the unit, as doing so may result in breakdown.
For an explanation of how to assemble the unit and the stand (PNS-501/401), refer to the "ASSEMBLY INSTRUCTIONS" included with
the stand.
When using the unit while mounted on a stand, be sure to ensure a sufficient amount of installation space for the unit. The required
installation spaces for this model are listed below.
CJ-500:
2700 mm (106-5/16 in.) wide, 900 mm (35-7/16 in.) depth, and 1500 mm (59-1/16 in.) high
CJ-400:
2400 mm (94-1/2 in.) wide, 900 mm (35-7/16 in.) depth, and 1500 mm (59-1/16 in.) high
12
Install in a level and stable location.
Otherwise the unit may tip over and cause
injury.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cammjet cj-400Cj-500

Table of Contents