Maintenance Schedule; Fuel Lines; Throttle Operation - Eton America Rascal IXL-40 Service Manual

Eton america kid's atv 40cc service manual
Table of Contents

Advertisement

2.2 MAINTENANCE SCHEDULE

The maintenance intervals in the follow table are based upon average riding conditions. Riding in unusually
dusty areas requires more frequent servicing.
FUEL LINE

THROTTLE OPERATION

AIR CLEANER
SPARK PLUG
CARBURETOR IDLE SPEED
DRIVE CHAIN
BRAKE SHOE WEAR
BRAKE SYSTEM
NUT, BOLT, FASTENER
WHEEL
STEERING SYSTEM
SUSPENSION SYSTEM
GEAR OIL
Note - I: Inspect and Clean, Adjust, Lubricate or Replace, if necessary
C: Clean
L: Lubricate
R: Replace

2.3 FUEL LINES

Inspect the fuel lines for deterioration, damage, or leakage
and replace if necessary.
2.4 THROTTLE OPERATION
Inspect for smooth throttle lever full opening and automatic
full closing in all steering positions. Inspect for
deterioration, damage, or kinking in the throttle cable. If
any, replace it.
Check the throttle lever. Free play is 5-10 mm at the tip of
the throttle lever.
Disconnect the throttle cable at the upper end. Lubricate
the cable with commercially lubricant to prevent premature
wear.
INITIAL SERVICE
REGULAR SERVICE
(First week)
(Every 30 operating days)
I
I
I,L
I
I
I
2-2
MAINTENANCE
EVERY YEAR
I
C
I
I
I,L
I
I
I
I
I
I
I
R

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents