Verifying Connections - Cisco 800 Series Hardware Installation Manual

800 series integrated services router
Hide thumbs Also See for 800 Series:
Table of Contents

Advertisement

Chapter 3
Connecting the Router
Figure 3-6
1
2
Plug the adapter cord into the router.
Step 2
Note

Verifying Connections

To verify that all devices are properly connected to the router, first turn on all the connected devices,
then check the LEDs. To verify router operation, refer to
For full LED description, see
Table 3-1
Power and Link
SYS
DC Power Supply PWR2-20W-12VDC and PWR2-20W-24VDC
2
1
Black wire (negative)
White wire (positive)
The power adapters have 18 AWG wires for the input connection. Tinned bare wires are used for
the input connection as there is no standard established for connector type. Screw terminal
blocks are most often used.
Table
Verifying the Router Operation
LEDs to Check
Yellow
Green (blinking)
Off
3
Adapter
Table
1-42.
Normal Patterns
FPGA download is complete.
ROMMON is operational.
After powering up, when FPGA is being downloaded (in
ROMMON).
Cisco Integrated Services Router Hardware Installation Guide
Cisco 810 Series
3-1.
3
3-7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents