Verifying Connections - Cisco IR829 Hardware Installation Manual

Industrial integrated services router
Hide thumbs Also See for IR829:
Table of Contents

Advertisement

Verifying Connections

Verifying Connections
To verify that all devices are properly connected to the router, first turn on all the connected devices, then
check the LEDs. To verify router operation, refer to
For full LED description, see
Table 10: Verifying the Router Operation
Power and Link
LEDs to Check
PWR
Green steady On
Green (flashing)
Amber
GE0 WAN
Steady On
Flashing
Off
Ethernet LAN Switch
Single LED per port
Ports
Sim cards
SIM0/SIM1
Cellular Modems
CELLULAR0/CELLULAR1
NOTE: There are single LTE and dual LTE SKUs available with the IR829. See
details.
Cisco IR829 Industrial Integrated Services Router Hardware Installation Guide
60
Table 10: Verifying the Router Operation , on page
Chapter 1, "LEDs"
Normal Patterns
Normal operation
Initializing interface ports
Solid after powerup - HW failure stateSolid after 60 seconds - In ROM
Monitor modeSolid after 60 seconds - Router is unreachable
Link is up
Transmitting and Receiving data
No network activity.
Off — No link
Green Steady on — Link is up
Green Flash — Transmitting and Receiving data
Amber — POE Fault, implies no link
Off — No USIM
Green — USIM installed and active
Off — Module not powered on
On — Module is powered on and connected but not transmitting or receiving
Slow Flash — Module is powered on and searching for connection
Fast Flash — Module is transmitting or receiving.
Connecting the Router
60.
Figure 8 on page -17
for

Advertisement

Table of Contents
loading

Table of Contents