Verifying Connections - Cisco IR829 Hardware Installation Manual

Integrated services router
Hide thumbs Also See for IR829:
Table of Contents

Advertisement

Chapter 3
Connecting the Router
Step 3
Using the pins included in the kit, crimp each pin onto a wire.
Step 4
Insert the pins into the power connector, referring to previous figures for
guidance.
Step 5
Plug the connector into the power entry receptacle.

Verifying Connections

To verify that all devices are properly connected to the router, first turn on all the connected devices,
then check the LEDs. To verify router operation, refer to
For full LED description, see
Table 3-1
Power and Link
PWR
GE0 WAN
Ethernet LAN
Switch Ports
Chapter 1, "LEDs"
Verifying the Router Operation
LEDs to Check
Green steady On
Green (blinking)
Yellow
Steady On
Flashing
Off
Single LED per
port
Cisco IR829 Integrated Services Router Hardware Installation Guide
Table
3-1.
Normal Patterns
Normal operation
Boot up phase or in ROM Monitor mode
System shutdown due to under or over voltage conditions
Link is up
Transmitting and Receiving data
No network activity.
Off — No link
Green Steady on — Link is up
Green Blink — Transmitting and Receiving data
Yellow — POE Fault, implies no link
Verifying Connections
3-6

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents