Cisco 800 Series Hardware Installation Manual page 156

800 series integrated services router
Hide thumbs Also See for 800 Series:
Table of Contents

Advertisement

Installing the Cisco 810 ISR
Figure 2-2
1
6-32 screws
2
Power cable with power cord lock installed
Step 3
Connect the supplied plenum rated Cat5 cable to the GE0 port on the PoE+ splitter.
Step 4
Connect the Cat5 cable from your PoE+ source to the PoE+ in port on the PoE+ splitter.
Step 5
Place the power cord lock onto the power cord behind the connector overmold as shown in
Slide the power cord lock forward so that it captures the overmold and is fully seated.
Figure 2-3
Cisco Integrated Services Router Hardware Installation Guide
2-4
6-32 Screws
Placement of the Power Cord Lock onto the Power Cord
1
1
Power cord connector
2
Power cord lock
Chapter 2
1
2
3
3
To PoE+ power source
4
GE CAT5 cable
2
Installing the Router
4
Figure
2-3.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents