Flow Diagram Control System - REMEHA Gas 110 Eco 115 Installation And Service Manual

Gas fired condensing boiler
Hide thumbs Also See for Gas 110 Eco 115:
Table of Contents

Advertisement

4.2 Flow diagram control system

Press the " "-key
Operating mode
§ 4.3
Setting mode, user level
§ 4.5
Setting mode, service level
§ 4.6
16
Press the "
"-key
"code"-display
Only digit or letter
-
,
,
,
Digit or letter with dot
Service engineer level only:
Gas 110 Eco 115 / 65
-display
Flow temperature or shut-off code
Flow temperature set-point
Pump run on time HTG
DHW temperature set-point
Boiler control setting
Base point internal compensation slope
Flow temperature set-point during forced part load
High limit temperature set-point
Fan speed at full load (HTG)
Fan speed at part load (HTG and DHW)
Modulation start point ∆T (F/R)
Interface selection (control option)
DHW cut-in ∆T
Fan speed at full load (DHW)
Intern
N/a
N/a
Forced part load time after start (HTG)
Fan speed at start
DHW control stop or boiler modulation set point (based on parameter
DHW control mode
N/a
HTG cut-in ∆T (based on return)
N/a
Boiler type
Intern
Maximum delay time
Start point for 0 V analog signal
End point for 10 V analog signal
Intern
)
26/01/2009 - 300014883-001-F

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gas 110 eco 65

Table of Contents