Used Symbols; Important Recommendations - REMEHA Gas 110 Eco 115 Installation And Service Manual

Gas fired condensing boiler
Hide thumbs Also See for Gas 110 Eco 115:
Table of Contents

Advertisement

1 Used symbols

Caution danger
Risk of injury and damage to equipment. Attention must be
paid to the warnings on safety of persons and equipment
Important information
Information must be kept in mind to maintain comfort
Reference
Refer to another manual or other pages in this instruction
manual

2 Important recommendations

For a proper operating of the boiler, follow carefully the
instructions.
Any intervention on the appliance and heating equipment
must be carried out by a qualified engineer.
The manufacturer is not liable for any improper use of the
appliance or failure to maintain or install the unit correctly
(the user shall take care to ensure that the system is
installed by a qualified engineer).
Work on electrical equipment must be carried out by a
qualified professional in compliance with the prevailing
regulations.
Check that the appliance is properly set for the type of gas
used.
Keep to the polarity shown on the terminals: phase (L),
neutral (N) and earth
Check the seal on the gas and water pipe connections.
We shall not accept any responsibility for any damage and
disturbance arising from not following these instructions.
26/01/2009 - 300014883-001-F
.
DHW: Domestic hot water
Installation must be carried out in accordance with the prevailing
regulations, the codes of practice and the recommendations in these
instructions with the relevant certification ie: ACS, IEE regulations,
etc.
The first start-up is to be performed by your installation/
commissioning engineer.
Only original spare parts must be used.
Any work on the boiler unit is authorised only if carried out by a
qualified engineer.
Before commissioning, the factory settings of the appliance must be
compared with the local energy supply conditions. If the settings have
to be modified, this must be carried out by a qualified professional.
Condensing boilers require a flue gas evacuation system or a fresh
air inlet specially adapted to the method of operation. Its execution
depends on the place of installation and the building.
Compliance with a minimum distance between the flue gas
evacuation system in forced flue mode or the boiler with combustible
substances must comply with current regulations. At nominal output,
the temperature of the components does not exceed 85 °C.
Work on electrical equipment must be carried out by a
qualified professional in compliance with the prevailing
legislation.
The installation and maintenance of the boiler must be done by a
qualified professional in compliance with the prevailing local and
national regulations.
Gas 110 Eco 115 / 65
5

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gas 110 eco 65

Table of Contents