SMA SUNNY ISLAND 8.0H Installation Manual page 86

Off-grid inverter
Hide thumbs Also See for SUNNY ISLAND 8.0H:
Table of Contents

Advertisement

7  Commissioning
13. Setting the cluster for an extension cluster:
• Select the 003.17 ClstMod parameter and
press the button.
• Set ExtnClst and press the button.
• Confirm the extension cluster with Y.
• Select the 003.18 ClstAdr parameter and
press the button.
• Set the address of the extension clusters and press the button, e.g. set the address of
extension cluster 1 to 1.
• Confirm the address of the extension clusters with Y.
• Continue with step 16.
14. Setting the type of the Multicluster Box:
• Select the 003.19 Box parameter and press
the button.
• Set the type of the Multicluster Box and press the button. Tip: The Multicluster Box type is
indicated on the type label of the Multicluster Box.
• Confirm the type of the Multicluster Box with Y.
15. Setting the maximum generator current:
• Select the 003.22 GnCurNom parameter and
press the button.
• Set the maximum current for permanent loading of the generator and press the button.
• Confirm the maximum current with Y.
86
SI80H-60H-OffGrid-IA-en-11
SMA Solar Technology AG
Installation Manual

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sunny island 6.0h

Table of Contents