7  Commissioning
Check item
Battery current sensor, if
present
Checking for AC1 and AC2 Terminals of the Off-Grid Inverter
Check item
AC1 and AC2 enclosure
openings
AC1 and AC2 terminals
AC1 terminal
If an external energy source is
connected, AC2 terminal
In a three-phase system,
allocation of the off-grid
inverters
72
SI80H-60H-OffGrid-IA-en-11
Check criterion
The battery current sensor can be loaded
with the maximum DC current (see technical
data of the battery current sensor).
Check criterion
All enclosure openings are sealed with M25
cable glands or filler-plugs.
The core cross-section of the cable must be
9 mm... 18 mm for an M25 cable gland.
All contact areas are free of insulation.
All levers on the terminals are in the
downward position.
All cables are securely clamped.
The stand-alone grid or the Multicluster Box
is connected to the AC1 Loads/
SunnyBoys terminals.
The external energy source is connected to
the AC2 Gen/Grid terminal.
For a TN system, the neutral conductor is
connected to the AC2 Gen/Grid N
terminal.
For a TT system, the neutral conductor is
connected to the AC2 Gen/Grid N
terminal.
The allocation of the off-grid inverters to the
line conductors of the stand-alone grid or the
Multicluster Box results in a right-hand
rotating magnetic field. Master must be
assigned to L1, slave 1 must be assigned to
L2, slave 2 must be assigned to L3.
SMA Solar Technology AG
OK
Not
applicable
OK
Not
applicable
TT