Requirements:
☐ All off-grid inverters must be closed.
☐ All off-grid inverters must be switched off.
1. Insert the fuse links into the BatFuse, quickly connect the switch-disconnectors of the BatFuse and
then close the BatFuse (see BatFuse installation manual).
2. Switching on the off-grid inverter:
• For an off-grid system with one off-grid inverter,
press the activation button on the off-grid
inverter.
• In the case of a cluster, press the activation
button on the master and hold down this button
until a signal sounds. All off-grid inverters in the
cluster are then switched on.
3. When the Sunny Remote Control displays
<Init System> , press and hold the button.
☑ A signal sounds three times and the
Sunny Remote Control displays the QCG.
✖ Does the Sunny Remote Control not display the QCG?
You not either pressed the button too slowly or have long enough.
• Press the deactivation button.
• Repeat steps 2 and 3.
Installation Manual
SI80H-60H-OffGrid-IA-en-11
7  Commissioning
77