SMA SUNNY ISLAND 8.0H Installation Manual page 55

Off-grid inverter
Hide thumbs Also See for SUNNY ISLAND 8.0H:
Table of Contents

Advertisement

SMA Solar Technology AG
If you are using a multi-function relay, always connect it as follows:
Assignment of the multi-function relays of the slaves
In case of a fault, the multi-function relays of the slaves switch less reliably than the multi-function
relays of the masters. If a fault occurs, the slaves wait for error confirmation from the master.
Additionally required material (not included in scope of delivery):
☐ 2 bootlace ferrules
Requirements:
☐ The technical requirements of the multi-function relay must be met (see Section 12 "Technical
Data", page 144).
☐ Conductor cross-section: 0.2 mm² ... 2.5 mm²
1. Break through the cable feed-through plate at a suitable position using a sharp object.
2. Strip the insulation from the cable and press bootlace ferrules onto the wires.
3. Lead the cable through the hole in the cable feed-through plate into the off-grid inverter.
4.
Danger to life from electric shock due to incorrect insulation
• Cut the silicone tube to the length of the cable.
• Pull the silicone tube over the cable.
☑ The cable is double-insulated.
• Lead the cable into the off-grid inverter making sure that it cannot touch any data cables.
Installation Manual
6  Electrical Connection
SI80H-60H-OffGrid-IA-en-11
55

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sunny island 6.0h

Table of Contents