10  External Energy Sources in the Off-Grid System
Automatic generator mode:
In automatic generator mode, the generator management controls the generator.
Automatic generator mode and generators without an autostart function
The generator management can control a signal generator using a multi-function relay.
The signal generator can indicate when you should start and stop the generator.
In automatic generator mode, the generator can be started and stopped manually at any time.
If the generator is stopped and the minimum stop time has elapsed, automatic mode is continued.
10.9 Operating Procedure for Generator Control
10.9.1 Operating Procedure for Generators with Autostart
Function
Event or state
The generator
management requests the
generator.
The generator starts.
The generator voltage is
within the configured
limiting values for voltage
and frequency.
The warm-up time is
running.
The warm-up time ends.
134
SI80H-60H-OffGrid-IA-en-11
Result
The off-grid inverter starts the generator.
The generator voltage builds up.
Generator management measures the time until
the generator voltage is within the configured
limiting values for voltage and frequency. If a
maximum time is exceeded, the generator
management aborts the generator start.
The generator management starts the warm-up
time.
The off-grid inverter synchronises the stand-alone
grid to the generator voltage.
SMA Solar Technology AG
Internal transfer
relay
Open, the
stand-alone grid is
not connected to
the generator.