Through Wall Installation (Main Floor Or Basement) - Enerzone Euromax Installation And Operation Manual

Hide thumbs Also See for Euromax:
Table of Contents

Advertisement

4.5.2 Through Wall Installation (Main Floor or Basement)

1. Position stove following clearances given in Section 3, Clearances to Combustible
Material and following vent manufacturer's instructions. Then locate the position of the
exhaust pipe in the wall.
2. Install wall thimble as per vent manufacturer's instructions.
3. Attach enough piping length to go through the wall thimble and extend at least 6 inches
beyond the exterior wall.
4. Attach cap and seal outside wall thimbles with high temperature waterproof silicone
sealant.
CAUTION: TO REDUCE THE RISK OF SMOKE SPILLAGE THERE SHOULD ALWAYS BE
AT LEAST 12" (30 CM) OF VERTICAL RISE FOR EACH FOOT OF HORIZONTAL RUN. IN
ALL CASES, AT LEAST 36" (91 CM) OF VERTICAL RISE IS NEEDED BEFORE THE
TERMINATION.
WARNING: TERMINATION SHOULD NOT BE LOCATED SO THAT HOT EXHAUST
GASES CAN BE A HAZARD. EXHAUST GASES CAN REACH TEMPERATURES OF
500°F (260°C) AND CAUSE SERIOUS BURNS. SEE SECTION 4.4.1 PERMITTED
TERMINATION LOCATION.
18
Euromax Pellet Stove Installation and Operation Manual

Advertisement

Table of Contents
loading

Table of Contents