Filling And Emptying - Lauda E 4 G Operating Instructions Manual

Heating and cooling thermostats with control head
Hide thumbs Also See for E 4 G:
Table of Contents

Advertisement

ECO GOLD
6.3

Filling and emptying

Filling
Withdraw the drain tap.
Maximum filling level is 20 mm below the bath bridge.
Optimum operation with 20-40 mm below the bath bridge.
Operation down to 60 mm below the bath bridge is possible.
Low-level switch-off at approx. 90 mm below the bath bridge!!!
With the use of oils as heat transfer liquids note that they expand on heating (approx.
10 %/100 °C).
With a connected external load the complete expansion takes place in the bath.
Emptying
28.04.10/ YACE0088
Switch off the thermostat and withdraw the mains
plug.
Push a hose onto the bath drain point.
Drain the heat transfer liquid via the drain tap at the
back of the device.
Drain tap, cooling thermostats
Drain tap, heating thermostats
Preparations
27

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Eco goldEt 15 gEt 20 g

Table of Contents