Touch Panel Controller; Test Run Operating Procedure - Fujitsu Airstage V-II Service Manual

Multi air conditioning system for buildings
Hide thumbs Also See for Airstage V-II:
Table of Contents

Advertisement

4. Touch panel controller

Test run operating procedure

<Monitor screen (icon)>
Monitor Mode
All
Lange Group
Office A
On
On
Cool
21.5 C
Restrant
Room 101
Off
On
Meeting 1
1
On
Off
Heat
21.5 C
Conference A
On
On
Heat
21.5 C
Group
Schedule
Op.Controlled
Op.Restricted
Error
Filter Sign
<Monitor screen (list)>
Monitor Mode
All
Lange Group
Name
Expand
Status
Office A
On
Office B
Mixed
PC Room
On
Room 101
Off
Restrant
On
Entrance
Off
Meeting 1
Off
Group
Schedule
RC Prohibition
Error
Filter Sign
Op. Controlled
Op. Restricted
(1) Select the objective you want to test run.
Select the objective icon or list at the monitor screen. (Multiple selections is possible)
Select all the devices registered as objectives by pressing "Select All" on the monitor screen.
(2) After objective selection at (1), switch to the <Setting screen> by pressing "Operation".
10/11.2008.Mar. 02:20 PM
Down
Top
Up
Office B
PC Room
On
Heat
21.0 C
Entrance
On
Auto
24.0 C
Meeting 2
Meeting 3
On
Parking lot
Conference B
Off
Auto
C
22.0
Mode
Set Temp.
10/11.2008.Mar. 02:20 PM
Down
Top
Up
Mode Set
Temp Fan
Heat
21.5 C High
Mixed Mixed Mixed Mixed
Low
Auto
24.0 C
Cool
26.0 C
Auto
Mode
Filter
All
Temp.
On/Off
Timer
On
Status: On
Setting
List
Schedule
Cool
26.0 C
C
Select All
Auto
Clear All
24.0 C
Heat
Operation
21.0 C
On
Off
Status: On
Setting
List
R/C
Schedule
Prohibit
Select All
Clear All
Operation
On
Off
01-08
UTY - DTG
(1)
(1)
(2)
( * )
(1)
(1)
(2)
( * )

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents