Test Run Control - Fujitsu Airstage V-II Service Manual

Multi air conditioning system for buildings
Hide thumbs Also See for Airstage V-II:
Table of Contents

Advertisement

1-3 TEST RUN CONTROL

1. When the test run signal is transmitted from standard wired, wireless remote controller,
simple remote controller, transmitted netwwork, and outdoor unit.
(1) The test run operation starts and the electric expansion valve is controlled to a maximum flow, regardless of
the temperature condition.
(2) Frost prevention operation has priority over item(1).
(3) Whether state of the indoor unit operates or stops, All units in the same refrigerant circuit will start to conduct a
test run in accordance with the operation mode set by push switch of outdoor unit ( see 1 - 2 - 3 ).
(4) After 60 minutes passes, the test run stops.
(5) Test running initialization is shown below.
Operating Mode
Fan speed
Room Temperature Indication
Vertical Air Direction Panel
Swing
*EXAMPLE
1
2
3
4
COMPACT CASSETTE TYPE
1
2
3
4
COMPACT WALL MOUNTED TYPE
EXCEPT FOR THE DUCT MODEL
Cooling
Heating
Hi
18
Position
1
Position
OFF
OFF
1
2
3
4
01-10
DUCT TYPE
Cooling
Hi
Hi
30
18
4
1
2
3
CEILING TYPE
Heating
Hi
30

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents