2.5 Technical Data
2.5.1 Runtimes at partial load
Gas engines were designed and optimized for continuous operation at 100 % load.
The following restrictions apply to ensure maximum operational availability of the engine plant and to re‐
duce maintenance to a minimum:
Power, referenced to nominal
load
0 % to 30 %
30 % to 50 %
50 % to 100 %
Recommended maximum run‐
time
at this load
30 minutes
120 minutes
No restriction
MS150032/02E 2012-07 | Product Summary | 21
Recommended minimum runtime
in subsequent operation
at load > 50 %
120 minutes
120 minutes
No restriction