6. ENGINE REMOVAL/INSTALLATION
Remove the two bolts at the left foot peg
attaching the left floor board holder and
remove the nut at the left floor board holder,
then remove the left floor board holder.
Remove the two bolts at the right foot peg
attaching the right floor board holder.
Remove the nut at the right floor board
holder and bolt attaching the reservoir
protection cover, then remove the right floor
board holder.
Remove the two nuts and then remove the
drive select lever.
Remove the two bolts at the left front fender
holder for remove the left front fender
holder.
6-5
Bolts
Reservoir protection Cover
Bolts
Drive Select Lever
Nuts
Left Front Fender Holder
Mongoose/KXR 250
Nut
Nut
Bolt
Bolts