6.2 Checklist prior to completion of TECDIS TCS and TECDIS AW
installation
If installation includes Track Control functionality, the following tests must be performed.
No.
Function
1
External data
2
External data
3
Alarm system Verify that TECDIS is connected to a separate alarm system.
4
System status Check that no alarms/warnings are pending in alarm window.
5
Chart database
AIS and ARPA
6
Targets
(If present)
Conning display
7
(If present)
Harbor Acceptance Test (15 minutes)
Go to setup menu and verify NMEA inputs are valid. Check
input values for position and course.
Verify that TECDIS receives valid sensor data from a minimum
of:
Two independent positioning sensors
Two independent heading sensors
A speed sensor
1,Select setup menu, chart utilities, chart licenses
2,Verify that licenses are valid for intended voyage
3,Click C-Map chart update
4,Verify that charts are updated in update log
Sea Trial Test (15 minutes)
1,Activate ARPA on radar and select a target.
2,Click the symbol button of [ARPA Targets].
3,Click the symbol button of [AIS Targets].
AIS and ARPA Targets are displayed on the top of charts.
Correct indication is shown at the each configured window on
the Conning Display. Verify that selected sensors used by
heading, position is correctly indicated.
TECDIS 1 and 2
Requirement
Page 66
Results
TECDIS 1:
□Good □NG □N/A
TECDIS 2:
□Good □NG □N/A
TECDIS 1:
□Good □NG □N/A
TECDIS 2:
□Good □NG □N/A
TECDIS 1:
□Good □NG □N/A
TECDIS 2:
□Good □NG □N/A
TECDIS 1:
□Good □NG □N/A
TECDIS 2:
□Good □NG □N/A
TECDIS 1:
□Good □NG □N/A
TECDIS 2:
□Good □NG □N/A
TECDIS 1:
□Good □NG □N/A
TECDIS 2:
□Good □NG □N/A
TECDIS 1:
□Good □NG □N/A
TECDIS 2:
□Good □NG □N/A