Scheduled Maintenance - Biddle CA2 Manual

Comfort air curtain
Table of Contents

Advertisement

M
ANUAL
4.3

Scheduled maintenance

Version: 6.1 (05-12-2011)
Biddle recommends that the following inspection and
maintenance work is performed by an installer or other
technical expert every year.
Check if the filter is clean enough and undamaged. Replace
the filter if necessary (see section 4.1).
Check that the heat exchanger or the electric heating
elements are clean. Settled dust may cause unpleasant
smells.
Gently remove dust with a vacuum cleaner.
c
Caution:
The fins of the heat exchanger are delicate parts.
w
Warning:
The fins of the heat exchanger are sharp.
Check the operation of the fans.
Check if the control panel has stored any error messages
(see section 5.3).
M
AINTENANCE
51

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents