Figure 2-6 Rapid Eye Unit Air Circulation - Honeywell Rapid Eye Installation Manual

Multi-media digital video recorder
Hide thumbs Also See for Rapid Eye:
Table of Contents

Advertisement

Leave at least 1 inch
of clearance between
the Rapid Eye unit
and the inside walls
of the enclosure.
There are exhaust
vents on both the
side and front of your
Rapid Eye unit.
Document 800-02607V3 Rev A
11/09
Caution
If the unit is installed in a closed or multi-unit rack assembly, the operating
ambient temperature of the rack environment may be greater than room
ambient. Therefore, consideration should be given to installing the
equipment in an environment compatible with the maximum ambient
temperature (Tma) specified by the manufacturer.
The following guidelines must be followed when installing your Rapid Eye unit:
Mount the Rapid Eye unit in a horizontal position.
There must be at least 1 inch of clear, unobstructed space around the front, rear and
sides of the unit (see
Figure
unit during operation.
Intake and exhaust vents in the enclosure should align with the intake and exhaust
vents on the Rapid Eye unit to maintain proper air flow (see
During operation, the maximum ambient temperature measured directly at the air
intake vent of the Rapid Eye unit must never exceed the maximum operating
temperature of 104°F (40°C).
Figure 2-6
Rapid Eye Unit Air Circulation
Cable space required at the back of the unit.
Caution
Units that are operating in an environment where the ambient temperature
measured at the intake vent is greater than 104°F (40°C) are not covered
by Honeywell warranty.
Rapid Eye™ Multi-Media DVR Installation Guide
2-6) to allow for sufficient air flow around the Rapid Eye
1 inch
Figure
2-6).
Exhaust and intake
vents on the Rapid
Eye unit and
enclosure should line
up for proper air
circulation.
The temperature at the
Rapid Eye unit intake
vent must never
exceed 104°F (40°C).
31

Advertisement

Table of Contents
loading

Table of Contents