Figure 6-23: Usb 3.0 Driver Setup Operations; Figure 6-24: Usb 3.0 Driver Installation Finish Screen - IEI Technology KINO-DQM871 User Manual

Mini-itx sbc with 4th generation 22nm intel mobile cpu up to 16.0 gb ddr3, hdmi, lvds, displayport, vga dual gbe, sata 6gb/s, usb 3.0, dual pcie mini pcie x16, intel® amt 9.0, roh
Hide thumbs Also See for KINO-DQM871:
Table of Contents

Advertisement

KINO-DQM871 Mini-ITX SBC
Step 11:
Setup Operations are performed as shown in Figure 6-23.
Step 12:
Once the Setup Operations are complete, click Next to continue.

Figure 6-23: USB 3.0 Driver Setup Operations

Step 13:
The Finish screen in Figure 6-24 appears.
Step 14:
Select "Yes, I want to restart this computer now" and click

Figure 6-24: USB 3.0 Driver Installation Finish Screen

Finish.Step 0:
Page 135

Advertisement

Table of Contents
loading

Table of Contents