Final Checks; Turning On The Power - Martin Magnum 1200 User Manual

Flood light martin
Hide thumbs Also See for Magnum 1200:
Table of Contents

Advertisement

F i n a l c h e c k s
Before applying power to the Magnum smoke machine, verify the following:
the machine is safely located or installed and meets the location
requirements stated on page 9
the operator is familiar with, and able to comply with, the requirements
for safe operation listed on page 3
the smoke fluid is one of the genuine Martin fluids listed under "Smoke
fluid options" on page 18
the machine is electrically grounded (earthed)
the AC power distribution circuits and lines are adequately rated for the
current load
T u r n i n g o n t h e p o w e r
Turn on the main power switch located next to the power cable inlet.
The red Heat indicator on the remote and on top of the machine will light for
about 7-10 minutes as the machine heats up to operating temperature.
When the green Ready indicator comes on, the machine is ready to make fog.
To obtain maximum output, wait another few minutes for the red Heat
indicator to go off, as fog output is reduced while the unit is heating
up.
Installation and setting up
11

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Magnum 1800

Table of Contents