DC Connection Parts
FIGURE:
Figure Legend
1
Strain relief housing
2
DC input plug
3
Cage clamp operating lever
3. Locate the three wires coming from the DC power source that will be used in
the connection to your unit:
-48V or -60V (negative terminal)
Chassis ground
-48V or -60V Return (positive terminal)
Note – Depending on the DC power source, the -48V or -60V (negative terminal)
might be marked with a minus (-) symbol. The -48V or -60V Return (positive
terminal) might be marked with a positive (+) symbol.
Assembling and Installing DC Power Cables for the SPARC Enterprise T5140 Server
87