Valor Horizon 534ILN Installation And Operation Instructions Manual page 17

Natural / propane gas direct vent gas fireplace heater
Table of Contents

Advertisement

Co-Axial Vertical Installations
• Check the roof pitch to determine which roof
fl ashing will be needed. See venting accessories list
on pages 37–38 for allowable components.
• The distance from the roof to the lowest terminal
discharge opening ("H" in fi gure) depends on
the roof pitch and must be in accordance with
the manufacturer's instructions supplied with the
termination unit.
Note: The venting system for these appliances is
considered to be a Special Venting System. The
rule in the Installation Code requiring a minimum
vent height of 2 feet above any portion of a building
within 10 feet does not therefore apply.
• The minimum clearances to combustible materials
all round the vent pipes must be in accordance
with the dimensions shown in the Co-Axial Venting
section of this manual.
• Drop a plumb from the ceiling to the center of the
appliance vent opening. Mark the position on the
ceiling. Drill a small hole at the marked position.
• Determine the position where the vent will pass
through the roof. If directly above the position where
it penetrates the ceiling, drop a plumb from the roof
to the small hole in the ceiling and mark the roof at
this spot.
If rafters or other obstructions will prevent a vertical
exit or if clear attic space is desired, the roof outlet
can be offset using 45 degrees elbows.
Drill a small hole at the marked position.
• A ceiling fi restop must be installed at the second
fl oor and higher fl oors.
A ceiling support should be used below the fl at
ceiling.
To install the fi restop and support, cut and frame a
10 inches (254 mm) square hole centered on the
small hole previously drilled.
• Fit vent accessory elbows and pipe lengths as
required up through ceiling support boxes and
fi restops.
If installation includes offset, support the offsetting
pipes every 3 feet (1 m) with wall straps as shown.
• Cut a hole in the roof centered on the small hole.
The hole must allow for the minimum clearances to
combustible materials. See Venting section in this
manual.
• Fit pipe lengths through the roof. Fit roof fl ashing
securing it with roofi ng nails.
• Fit storm collar and termination cap.
Co-Axial Venting
Plumber's tape
fixed to wall strap
Ceiling
firestop
Ceiling
support
Through the roof installation
Joists
Firestop hole
Horizontal
overhang
Termination
cap
Vertical
Min.
wall
18"
Storm
collar
Roof
flashing
Wall strap
Offset elbows
Roof Pitch
Flat to 7/12
Over 7/12 to 8/12
Over 8/12 to 9/12
Over 9/12 to 10/12
Over 10/12 to 11/12
Over 11/12 to 12/12
Over 12/12 to 14/12
Overhang should
not extend beyond
vent if within 48" of
termination cap
Min. 24"
(unvented soffit)
Min. 36"
(vented soffit)
'H'
Minimum
'H' (feet)
1'
1.5'
2'
2.5'
3.25'
4'
5'
17
17

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Horizon 534ilp

Table of Contents