Sfp Module - IBM TotalStorage FAStT600 Installation And User Manual

Fibre channel storage server
Hide thumbs Also See for TotalStorage FAStT600:
Table of Contents

Advertisement

DANGER
Some laser products contain an embedded Class 3A or Class 3B laser
diode. Note the following.
Laser radiation when open. Do not stare into the beam, do not view directly
with optical instruments, and avoid direct exposure to the beam.
Attention:
When you handle static-sensitive devices, take precautions to avoid
damage from static electricity. For details about handling static-sensitive devices,
see "Handling static-sensitive devices" on page 5.
1. Remove the SFP module from its static-protective package.
2. Remove the protective cap from the SFP module, as shown in Figure 30. Save
the protective cap for future use.
Plastic tab
Protective cap
Figure 30. SFP Module
3. Remove the protective cap from the host port. Save the protective cap for future
use.
4. Insert the SFP module into the host port until it clicks into place. See Figure 31.

SFP module

Fiber-optic
cable
Figure 31. Installing an SFP module into the host port
5. Connect a Fibre Channel cable.
SFP module
Raid controller
Chapter 3. Cabling the storage server
35

Advertisement

Table of Contents
loading

Table of Contents