Raid Controller Removal - IBM TotalStorage FAStT600 Installation And User Manual

Fibre channel storage server
Hide thumbs Also See for TotalStorage FAStT600:
Table of Contents

Advertisement

|
|
|
If you have a second RAID controller, repeat this step for the second controller.
Caution: Observe ESD procedures when removing CRUs from the FAStT600
storage server. See the storage server documentation for handling guidelines
before removing any ESD-sensitive devices.
1
1
Figure 10. RAID controller removal
2. To remove a hot-swap fan, slide the latch on the fan to unlock it; then pull the
handle and remove the fan from the storage server.
Repeat this step for the other fan and set both fans aside for later installation.
2
2
Figure 11. Hot-swap fan removal
3. To remove a power supply, grasp the pull-ring on the power supply lever and
squeeze to release it; then pull the lever fully open and remove the power
supply from the storage server.
Repeat this step for the other power supply; then set both power supplies aside
for later installation.
Chapter 2. Installing and configuring the storage server
19

Advertisement

Table of Contents
loading

Table of Contents